A 200-240 block/shift insulated concrete forms production line

 Item

 Quantity

 PV-1 preexpander

 1

 Blockmold for the production of ordinary blocks, 100-120 blocks/shift output

 1

 Blockmold for the production of end (corner) blocks, 100-120 blocks/shift output

 1

 Silo bunkers (4 pcs х 5 c.m.)

4

 Suction fan

 1

 1KEP-160/0.4 (200 kg of steam per hour, 6 atm.), electrode, with an electronic control box

 1

 Steam accumulator (0,43 c.m.)

 2

 PVC air transfer duct, r.m.

 24

 Fittings, stirrups, set

1

 Cables, set

1

 Other installation accessories (bends, taps, set-downs, hoses, etc.), set

 1

Total, RUB

 1 261 264

Documents, installation and adjustment

 Type of work

 Price, RUB

Note

 Preparatory stage

 25 000

The price includes equipment adjustment to the premises and existing conditions, set of documents (process sheet, technology description).
 Installation

 65 000

Installation of the equipment, assembly of the main machines and communication lines according to PFDs.
 Adjustment and starting-up

 16 000

Adjustment, starting-up and personnel training.